WHOLE HOME REMODELING IN SAMMAMISH, WA

Undoing Builder-Grade

There is a specific list of things that get installed in a production house because they are fast and cheap, and every one of them is on the demo pile in a proper whole-home remodel.

Hollow-core doors that transmit every sound in the house. Particleboard cabinet boxes with stapled joints. Vinyl windows with failed seals. Carpet stapled over underlayment. A dropped soffit over the kitchen. Trim so thin it dents under a vacuum.

A whole-home remodel replaces all of it with the real version: solid-core doors, plywood cabinet construction, wood-clad windows, hardwood and tile, and casing with enough mass to hold a profile.

WHAT THE SCOPE COVERS

Full gut to studs. Structural rework to open the plan, with new beams and posts and footings under them. Complete mechanical replacement. New insulation and air sealing. New windows, siding, and roof. New kitchen and every bath. New flooring, trim, doors, and hardware throughout. Rebuilt stairs where the plan calls for it.

We also fix the things the original build got wrong and nobody noticed for thirty years: the bath fan that vents into the attic, the dryer duct full of lint, the hose bib with no shutoff, the deck ledger flashed with caulk.

Why Not Just Move?

Because in Sammamish you would be buying the same production house one street over, at today’s price, with the same problems. Renovating the one you own gets you a custom house on a lot you already like, in a school boundary you already chose, for less than the cost of a replacement purchase plus a second set of transaction costs.

SEQUENCING A GUT JOB

A whole-home remodel runs in a fixed order and there is no useful way to compress it: demo, structural, rough mechanical, inspection, insulation and air seal, drywall, then finishes. We hold to the order because skipping ahead creates rework.

You will be out of the house. Six to nine months of construction, after design and permitting. We tell clients that in the first meeting so the plan can be built around it.

Waterproofing and the Wet Areas

Bathrooms fail at the same five places every time: the pan, the curb, the niche, the valve penetration, and the wall-to-floor joint. We build showers with a sloped mud bed, a bonded membrane, cement board, and a flood test before tile. It is the least visible money in the project and the most consequential.

Budget and Alternates

We price a line-item budget in pre-construction and identify alternates for the finishes you are torn on, so the decision stays open until you see the number. If the total needs to come down, we cut from the alternates first and the structure last.

The Walkthrough

Matt walks the finished house with you, item by item, and does not hand over until the list is clear. One-year warranty after that, plus the optional Home Care Program.